Project Site WP7: Salerno - Test Facility for large Magnet and superconducting Line (TFML). The objective is the setup of a large cryogenic facility capable to test magnets up to 25 kA at various temperatures and types of cooling in the 4 K-25 K range, and test the SL with a current capability of at least 40 kA and 25 kV.

The program is aimed to strengthen the field of activity in a new Test Facility for large Magnet and superconducting Line (TFML), and in general to integrate the capabilities of the national network in the field of superconducting magnets (i.e. Genova and Milano sites). Within this framework, to support the demanding for new innovative green technologies, we also take the responsibility for installing a new test facility able to test power transmission lines (up to 1 GW) to be used in HVDC section, based on superconducting technology, thus working at cryogenic temperatures. Thus, we practically have five main activities in this WP:

Setting a new testing facility for 1 GW HVDC superconducting line, extending up to 150 m in length. This testing facility will include a control hall with technological services like the cryogenic refrigeration system (He stream 500W @ 20K +500 W@77K), the power converter (40 kA, the HV power supply (25-kV), services and safety. Finally a long (60-70m) covered dugout for hosting the superconducting power cable will be realized. This activity is not an extension of existing laboratory, but a new dedicated facility which falls in the new “green” line energy, one of the most promising societal applications of the superconductivity. The special application envisaged is the HVDC back lines, which are the latest technology for connecting different grids regardless their frequency. The DC operation is the ideal mode for a superconductor, which falls in its zero dissipations state. It will require a dedicated civil infrastructure for safety reasons. The maximum testing capabilities will be of about 1 GW, separately achieved as 40 kA maximum current, and 25 kV maximum voltage. Thus, a suitable cryogenic refrigerator providing the 20K He stream, a 40 kA power converter, and a 25 kV power supply, will be procured and installed. The control room will be foreseen, though its electronics is developed in WP 5. The test station will foresee also a long covered external dugout where the power line under test will be hosted in a safe way. The O.U. taking care of this activity is he INFN-Napoli (Salerno Group) 


 

INFN-NA - ISTITUTO NAZIONALE DI FISICA NUCLEARE (INFN)

 

SPIN-SA - Consiglio Nazionale delle Ricerche

SA-DIFI - Università degli Studi di Salerno